NWT
  • home
  • Service
    • Energy
    • Water
    • Industry
  • References
    • Publication
  • News
  • AboutUs
  • Contact
  • Deutsch
  • Español

Day: November 15, 2021

Hydraulic optimizations in the source area of the second Vienna Spring Water Main

Posted on 15. November 2021 by hdemo

In the area of the Siebensee Springs – Wildalpe the Vienna Waterworks MA 31 plans a capacity extension of the Siebensee pipeline. NWT carries out the necessary hydraulic calculations based on the actual conditions of the 4 partial pipelines and creates possible variants with the help of model calculations.

Leave a comment

Posts navigation

NWT OG

Austria
A-5020 Salzburg
Moosstrasse 1
0043 664 1370715

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
A-5020 Salzburg, Moosstrasse 1
info@nwtechnology.at
0043 664 1370715

copyright by NWT OG