NWT will optimize the aeration and air supply scheme at the industrial production site of one of the largest pulp and synthetic fibre producers in Europe.
The overall plant has a design load of 60 tCOD/d and comprises a 2 stage anaerobic treatment followed by a 2 stage aerobic treatment scheme and shall be optimized to increase the efficiency of the plant. Pilot tests will be carried out in 2016/17 with subsequent implementation hereinafter.