leachate treatment plant at solid waste landfill in Georgia

As part oft he ISWM II program financed by the German KfW, NWT is providing the designs for 2 domestic solid waste landfills.

The leachate treatment plants  will be integrated into the landfills which are currently under design/construction and shall treat highly contaminated leachates of up to 120 m3/d

A specific challenge is the very low dilution capacity of the recipient which makes a multi-stage RO system with additional treatment steps necessary.

It is expected that the related tender documents are ready by 2022

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.