Consulting Service for the 2nd Vienna Hochquellleitung

NWT has been commissioned with the plant engineering and hydraulic consulting for the integration of a UV disinfection system and a ClO2 disinfection system into the the supply scheme of the 2nd Vienna Hochquellleitung with a capacity of 2,8 m3/s between the existing terminal chamber built 1920 and the 140.000 m3 storage tank at Lainz built 1936

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.