Consulting Service for the 2nd Vienna Hochquellleitung
NWT has been commissioned with the plant engineering and hydraulic consulting for the integration of a UV disinfection system and a ClO2 disinfection system into the the supply scheme of the 2nd Vienna Hochquellleitung with a capacity of 2,8 m3/s between the existing terminal chamber built 1920 and the 140.000 m3 storage tank at Lainz built[…]