Feasibility Study Alexandria / Egypt

The European Investment Bank (EIB) has assigned the feasibility study for the upgrade and extension of the Alexandria WWTP. Dorsch International Consultant GmbH had been assigned and Dr. Demoulin will be the Team Leader for the coonsulting works. The time frame for the study is about 1 year and shall comprise the conceptual design and cost estimation for the plant “Alexandria West” with a nominal cpacity of 0,5 Mio m3/d.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.